Architecture & Urban Design · Leipzig
Structure is the statement.
ROHWERK Architekten designs buildings that stay honest about how they're built — exposed structure, considered materials, and civic ambition, from Leipzig across Saxony and beyond.
Section A–A · scale 1 : 100 · plotted while you scroll
- Years in Practice
- 0+
- Buildings Realized
- 0+
- Floor Area Delivered
- 0 m²
- Design Awards
- 0
Work Index
5 entries| No. | Project | Typology | Location | Year |
|---|---|---|---|---|
| P-01 | Spinnerei Lofts | 2023 | ||
| P-02 | Auenwald Kindergarten | 2022 | ||
| P-03 | Karl-Heine Housing | 2021 | ||
| P-04 | Bogenhalle Cultural Center | 2020 | ||
| P-05 | Waldrand Houses | 2019 |
Spinnerei Lofts
Adaptive Reuse · Leipzig-Plagwitz · 2023
A former cotton mill converted into 38 loft residences, keeping the original sawtooth roof and brick shell exposed throughout.
General Notes
The PracticeDesign as a structural argument
We don't decorate buildings — we reason through them. Every project starts with load paths, light, and how people actually move through a space, before it becomes a facade.
Founded in Leipzig's Plagwitz district — a neighborhood rebuilt from its own industrial shell — ROHWERK designs residential, cultural, and adaptive-reuse buildings across Saxony. We work in small teams, stay involved from first sketch to final inspection, and never hand a project off to someone who wasn't in the room for the concept.
- N-01All structure shown is load-bearing. Nothing on these sheets is applied decoration.
- N-02Materials are specified for how they weather, not for how they render.
- N-03The partner who drew the concept signs the inspection.
Structure First
Load-bearing logic and materials drive the form — not the other way around.
Built to Weather
Concrete, steel, and timber chosen for how they age, not just how they render.
Layers
what we deliverDesign Disciplines
- — Masterplanning
- — New-Build Residential
- — Cultural & Civic
- — Adaptive Reuse
Delivery
- — Concept & Feasibility
- — Planning Permission
- — Tender Documentation
- — Site Supervision
Schedule
26 months · HOAI phasesHover a bar to read the phase note.
Revisions
what clients marked up“They kept the building's memory in the walls instead of erasing it. Every visitor asks about the brick before they ask about the rent.”
Commission
start a projectSend us the site, the brief and the number you have in mind. We answer with questions, then a fee proposal.
- Studio
- Spinnereistraße 7, 04179 Leipzig